Technical equipment installation/removal instruction
 
 
 

18.05.09

“Technical regulations about fire safety requirements” (FS ¹123) was approved by Federal Statue on the 22nd of July, 2008

Read more...


02.03.09
In 2009 the 13th annual contest for Quality prize of the Russian Federation Government will be held.
Each organization submits its materials which are objectively estimated by the group of contest experts. Read more ...


17.11.08

9 December, 2008 the Neva International Ecological Congress was held in Tavricheskiy Palace (Saint-Petersburg). Evgeniy Petrosyan, the Deputy Leader of the Federal Agency for Technical Regulating and Metrology, reported at the plenary meeting.


15.12.08

The 7th International Specialized Exhibition “LaboratoryExpo-2009” will be held in Moscow from 20 to 23 October, 2009.


 
 

Instruction on installation/removal (installation, maintenance) of a product (prepared if these matters are not mentioned in Operation manual)
- document, containing data, required for installation, maintenance, setting, starting up, adjusting, running test and commissioning of a unit and its components on the site.

As a rule, if preparation for installation, installation, start-up, adjustment and running test are performed on the site by personnel who will operate the equipment further on all necessary information is included into Operation manual.

Engineering equipment installation/removal manual contains the following sections preceded by introduction without title:

- general instructions;
- safety precautions;
- preparation of equipment for installation and connection;
- installation and removal;
- setting, connection and test performance;
- startup (try-out);
- adjustment;
- integral inspection;
- running test;
- handing-over installed and connected equipment.

 
 